The Office Centre – Fit Out

Expert Logo Work

This was an interesting job.

The unit itself was old and needed to be fully refurbished.

We changed the ceiling, the sub-floor, carpet, ceiling lights, moved electrical outlets, moved data points, drylined the walls in the back hallway and fully installed the display units.

This was an intense program and the store closed for only 3 days.

At the end of this project, the client was delighted with the overall result.